ITAC Assessment: NC0623
ITAC logo
ITAC Assessment: NC0623
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Fabrics
NAICS 336360: Motor Vehicle Seating and Interior Trim Manufacturing
SIC 2396: Automotive Trimmings, Apparel Findings, and Related Products
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 300,000
ft2
Annual Production 11,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $627,886 11,941,445
kWh
Electricity Demand $223,086 22,601
kW-mo/yr
Natural Gas $717,426 158,263
MMBtu
Waste Disposal Costs
Water Usage $521,992 253,584
Tgal
TOTAL YEARLY COSTS $2,090,390
RECOMMENDED SAVINGS* $66,371 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,921

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,801 $500 $2,529
45,160
kWh
$776
-
kW-mo/yr
- - $(-480.0) $(-24.0)
02 2.4239: Eliminate or reduce compressed air usage $1,322 $900 $1,322
23,615
kWh
- - - - -
03 2.2136: Install / repair insulation on steam lines $2,320 $1,203 - - $2,320
-
MMBtu
- - -
04 3.1191: Change procedures / equipment / operating conditions $6,478 $16,800 $(-580.0)
(-10,350)
kWh
$(-422.0)
-
kW-mo/yr
- $32,480
-
Tgal
$(-25,000.0) -
05 2.7241: Install outside air damper / economizer on hvac unit $14,884 $10,000 $14,884
265,790
kWh
- - - - -
06 2.4154: Avoid rewinding motors more than twice $38,566 $70,014 $29,512
526,997
kWh
$9,054
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $66,371 $99,417 $47,667
851,212
kWh
$9,408
-
kW-mo/yr
$2,320
-
MMBtu
$32,480
-
Tgal
$(-25,480.0) $(-24.0)
TOTAL IMPLEMENTED $12,921 $19,403 $3,271
58,425
kWh
$354
-
kW-mo/yr
$2,320
-
MMBtu
$32,480
-
Tgal
$(-25,480.0) $(-24.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs