ITAC Assessment: NC0622
ITAC logo
ITAC Assessment: NC0622
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product School bus seating
NAICS 336999: All Other Transportation Equipment Manufacturing
SIC 3799: Transportation Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 233
Plant Area 140,000
ft2
Annual Production 315,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $194,126 3,298,123
kWh
Electricity Demand $37,387 8,724
kW-mo/yr
Natural Gas $143,493 18,879
MMBtu
TOTAL YEARLY COSTS $375,006
RECOMMENDED SAVINGS* $52,993 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,610

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $13,812 $46,617 $11,930
202,553
kWh
$1,882
-
kW-mo/yr
- - -
02 2.7135: Install occupancy sensors $481 $250 $481
8,164
kWh
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,414 $525 $4,287
72,798
kWh
$652
-
kW-mo/yr
- $(-360.0) $(-165.0)
04 2.4239: Eliminate or reduce compressed air usage $161 $450 $161
2,736
kWh
- - - -
05 2.4226: Use / purchase optimum sized compressor $1,361 $6,000 $935
15,880
kWh
$426
-
kW-mo/yr
- - -
06 2.2437: Recover waste heat from equipment $4,913 $8,000 - - $4,913
-
MMBtu
- -
07 2.7243: Improve air circulation with destratification fans / other methods $1,221 $1,000 $1,060
18,000
kWh
$161
-
kW-mo/yr
- - -
08 2.7241: Install outside air damper / economizer on hvac unit $10,727 $28,500 $10,727
182,130
kWh
- - - -
09 2.8114: Change rate schedules or other changes in utility service $15,903 $500 $15,903
-
kWh
- - - -
TOTAL RECOMMENDED $52,993 $91,842 $45,484
502,261
kWh
$3,121
-
kW-mo/yr
$4,913
-
MMBtu
$(-360.0) $(-165.0)
TOTAL IMPLEMENTED $34,610 $47,892 $32,601
283,515
kWh
$2,534
-
kW-mo/yr
- $(-360.0) $(-165.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs