| Assessment Year | 2018 |
|---|---|
| Principal Product | Plastics |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 300 |
| Plant Area |
240,000
ft2
|
| Annual Production | 6,000,000
pieces
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $917,762 | 25,377,000 |
kWh
|
$0.036 |
| Electricity Demand | $402,347 | 40,969 |
kW-mo/yr
|
$9.82 |
| Natural Gas | $88,889 | 24,325 |
MMBtu
|
$3.65 |
| TOTAL YEARLY COSTS | $1,408,998 | |||
| RECOMMENDED SAVINGS* | $77,957 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,542 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4239: Eliminate or reduce compressed air usage | $1,189 | $2,250 |
$1,189
32,850
kWh
|
- | - | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $3,305 | $10,000 |
$2,419
66,813
kWh
|
$886
-
kW-mo/yr
|
- | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,426 | $100 |
$3,970
109,675
kWh
|
$1,456
-
kW-mo/yr
|
- | |
| 04 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $21,184 | $100,000 |
$21,184
585,200
kWh
|
- | - | |
| 05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $927 | $1,000 | - | - |
$927
-
MMBtu
|
|
| 06 | 2.2437: Recover waste heat from equipment | $45,926 | $200,000 |
$(-31,436.0)
(-868,389)
kWh
|
$(-11,527.0)
-
kW-mo/yr
|
$88,889
-
MMBtu
|
|
| TOTAL RECOMMENDED | $77,957 | $313,350 |
$(-2,674.0)
(-73,851)
kWh
|
$(-9,185.0)
-
kW-mo/yr
|
$89,816
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $7,542 | $3,350 |
$5,159
142,525
kWh
|
$1,456
-
kW-mo/yr
|
$927
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs