IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Photographic paper
NAICS 325992: Photographic Film, Paper, Plate, and Chemical Manufacturing
SIC 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 350,000
ft2
Annual Production 6,000
thousand feet
Production Hrs. Annual 4,750
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $533,779 13,664,000
kWh
Electricity Demand $388,859 34,640
kW-mo/yr
Natural Gas $371,400 74,799
MMBtu
TOTAL YEARLY COSTS $1,294,038
RECOMMENDED SAVINGS* $96,830 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $72,974

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.2444: Use hot process fluids to preheat incoming process fluids $23,044 $93,000 $4,434
113,400
kWh
$7,525
-
kW-mo/yr
$11,085
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,828 $10,328 $1,075
27,489
kWh
$1,477
-
kW-mo/yr
- $276
03 2.7124: Make a practice of turning off lights when not needed $118 $50 $62
1,577
kWh
$44
-
kW-mo/yr
- $12
04 2.4239: Eliminate or reduce compressed air usage $812 $1,000 $474
12,113
kWh
$338
-
kW-mo/yr
- -
05 2.4221: Install compressor air intakes in coolest locations $685 $2,000 $491
12,556
kWh
$194
-
kW-mo/yr
- -
06 2.8114: Change rate schedules or other changes in utility service $65,888 $500 $65,888
-
kWh
- - -
07 2.4151: Develop a repair/replace policy $3,455 $11,302 $1,412
36,119
kWh
$2,043
-
kW-mo/yr
- -
TOTAL RECOMMENDED $96,830 $118,180 $73,836
203,254
kWh
$11,621
-
kW-mo/yr
$11,085
-
MMBtu
$288
TOTAL IMPLEMENTED $72,974 $24,180 $68,928
77,741
kWh
$3,758
-
kW-mo/yr
- $288
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs