ITAC Assessment: NC0604
ITAC logo
ITAC Assessment: NC0604
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Aircraft components
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area 110,000
ft2
Annual Production 17,500
pieces
Production Hrs. Annual 2,125
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $117,714 1,687,069
kWh
Electricity Demand $9,070 5,067
kW-mo/yr
Natural Gas $11,642 1,031
MMBtu
TOTAL YEARLY COSTS $138,426
RECOMMENDED SAVINGS* $2,874 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,606 $3,300 $1,436
20,567
kWh
$21
-
kW-mo/yr
- - $149
02 2.2437: Recover waste heat from equipment $452 $1,000 - - $452
-
MMBtu
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $311 $200 $491
7,028
kWh
$20
-
kW-mo/yr
- $(-100.0) $(-100.0)
04 2.4151: Develop a repair/replace policy $505 $2,577 $441
6,323
kWh
$64
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $2,874 $7,077 $2,368
33,918
kWh
$105
-
kW-mo/yr
$452
-
MMBtu
$(-100.0) $49
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs