ITAC Assessment: NC0603
ITAC logo
ITAC Assessment: NC0603
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Yarns
NAICS 313110: Fiber, Yarn, and Thread Mills
SIC 2281: Yarn Spinning Mills
Sales Range $1
M
to 5
M
# of Employees 110
Plant Area 135,000
ft2
Annual Production 25,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $463,064 11,598,000
kWh
Electricity Demand $256,141 22,666
kW-mo/yr
TOTAL YEARLY COSTS $719,205
RECOMMENDED SAVINGS* $131,175 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $63,467

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $17,643 $50,038 $8,818
220,990
kWh
$5,246
-
kW-mo/yr
- $3,579
02 2.7135: Install occupancy sensors $40 $100 $40
998
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,607 $500 $4,002
100,296
kWh
$1,605
-
kW-mo/yr
$(-500.0) $(-500.0)
04 2.4239: Eliminate or reduce compressed air usage $74 $240 $74
1,864
kWh
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $3,221 $100 $2,300
57,624
kWh
$921
-
kW-mo/yr
- -
06 2.4226: Use / purchase optimum sized compressor $21,836 $50 $12,616
316,201
kWh
$9,220
-
kW-mo/yr
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $64,413 $100,000 $44,754
1,121,648
kWh
$19,659
-
kW-mo/yr
- -
08 2.7241: Install outside air damper / economizer on hvac unit $19,341 $30,000 $19,341
484,733
kWh
- - -
TOTAL RECOMMENDED $131,175 $181,028 $91,945
2,304,354
kWh
$36,651
-
kW-mo/yr
$(-500.0) $3,079
TOTAL IMPLEMENTED $63,467 $80,688 $44,817
1,123,218
kWh
$16,071
-
kW-mo/yr
$(-500.0) $3,079
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs