Assessment Year | 2017 |
---|---|
Principal Product | Electronic switches |
NAICS | 334419: Other Electronic Component Manufacturing |
SIC | 3679: Electronic Components, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 58 |
Plant Area |
55,000
ft2
|
Annual Production | 300,000
units
|
Production Hrs. Annual | 2,100
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $81,303 | 1,563,040 |
kWh
|
$0.052 |
Electricity Demand | $38,716 | 4,307 |
kW-mo/yr
|
$8.99 |
Natural Gas | $3,514 | 468 |
MMBtu
|
$7.51 |
TOTAL YEARLY COSTS | $123,533 | |||
RECOMMENDED SAVINGS* | $23,567 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,833 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,256 | $36,992 |
$6,506
125,122
kWh
|
$5,212
-
kW-mo/yr
|
- | - | $1,538 | |
02 | 2.7135: Install occupancy sensors | $300 | $1,500 |
$300
5,775
kWh
|
- | - | - | - | |
03 | 2.2437: Recover waste heat from equipment | $1,262 | $500 | - | - |
$1,262
-
MMBtu
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,240 | $200 |
$1,957
37,632
kWh
|
$483
-
kW-mo/yr
|
- | $(-100.0) | $(-100.0) | |
05 | 2.4239: Eliminate or reduce compressed air usage | $2,472 | $2,940 |
$2,472
47,530
kWh
|
- | - | - | - | |
06 | 2.4151: Develop a repair/replace policy | $4,037 | $13,627 |
$2,255
43,361
kWh
|
$1,782
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $23,567 | $55,759 |
$13,490
259,420
kWh
|
$7,477
-
kW-mo/yr
|
$1,262
-
MMBtu
|
$(-100.0) | $1,438 | ||
TOTAL IMPLEMENTED | $19,833 | $52,319 |
$11,018
211,890
kWh
|
$7,477
-
kW-mo/yr
|
- | $(-100.0) | $1,438 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs