ITAC Assessment: NC0597
ITAC logo
ITAC Assessment: NC0597
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Jet engine parts
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 300,000
ft2
Annual Production 3,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,265,510 16,896,000
kWh
Electricity Demand $264,078 30,600
kW-mo/yr
Natural Gas $67,699 7,797
MMBtu
TOTAL YEARLY COSTS $1,597,287
RECOMMENDED SAVINGS* $137,954 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $21,985 $24,572 $16,419
219,207
kWh
$3,287
-
kW-mo/yr
$2,279
02 2.4224: Upgrade controls on compressors $74,459 $160,000 $64,146
856,423
kWh
$10,313
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $1,175 $3,200 $787
10,513
kWh
$388
-
kW-mo/yr
-
04 2.2628: Utilize a less expensive cooling method $5,207 $14,400 $4,368
58,320
kWh
$839
-
kW-mo/yr
-
05 2.2628: Utilize a less expensive cooling method $35,128 $100,000 $29,660
396,000
kWh
$5,468
-
kW-mo/yr
-
TOTAL RECOMMENDED $137,954 $302,172 $115,380
1,540,463
kWh
$20,295
-
kW-mo/yr
$2,279
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs