ITAC Assessment: NV0168
ITAC logo
ITAC Assessment: NV0168
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product bread, cake, and related products
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 20,000
ft2
Annual Production 12,000,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $150,419 2,409,000
kWh
Electricity Demand $34,352 4,166
kW-mo/yr
Electricity Fees $815 -
Natural Gas $94,742 17,622
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $135,768 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $23,982 $160 n/a $19,754
320,047
kWh
$4,228
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,550 - n/a $1,277
20,809
kWh
$273
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,700 $8,947 n/a $3,971
64,478
kWh
$729
-
kW-mo/yr
-
04 3.5311: Recover and reuse waste material $99,450 $400 n/a - - $99,450
-
lb
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $6,086 $2,074 n/a - - $6,086
-
lb
TOTAL RECOMMENDED $135,768 $11,581 $25,002
405,334
kWh
$5,230
-
kW-mo/yr
$105,536
-
lb
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs