ITAC Assessment: TN0472
ITAC logo
ITAC Assessment: TN0472
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product FUNERAL CASKET TRIM
NAICS
n/a
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 73
Plant Area
n/a
Annual Production 250,000
pieces
Production Hrs. Annual 4,704
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,800 530,774
kWh
Natural Gas $35,492 6,774
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,144 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,144

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7314: Reduce ventilation air $6,968 $12,000 - $6,968
-
MMBtu
02 2.2511: Insulate bare equipment $1,087 $717 - $1,087
-
MMBtu
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,104 $960 $3,447
61,547
kWh
$(-343.0)
-
MMBtu
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $788 $115 $788
14,068
kWh
-
05 2.4312: Improve lubrication practices $197 - $197
3,517
kWh
-
TOTAL RECOMMENDED $12,144 $13,792 $4,432
79,132
kWh
$7,712
-
MMBtu
TOTAL IMPLEMENTED $12,144 $13,792 $4,432
79,132
kWh
$7,712
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs