Assessment Year | 1997 |
---|---|
Principal Product | Processed Aluminum Castings |
NAICS |
n/a
|
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
14,000
ft2
|
Annual Production | 240,000
pieces
|
Production Hrs. Annual | 7,056
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $84,920 | 1,489,742 |
kWh
|
$0.057 |
Electricity Demand | $26,066 | 3,756 |
kW-mo/yr
|
$6.94 |
Electricity Fees | $1,129 | - |
|
- |
Natural Gas | $29,865 | 3,495 |
MMBtu
|
$8.55 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $53,476 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $47,232 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $921 | $4,297 |
$580
10,258
kWh
|
$341
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.4133: Use most efficient type of electric motors | $1,383 | $1,982 |
$1,383
24,326
kWh
|
- | - | - | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,369 | $50 |
$1,798
31,653
kWh
|
$571
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,139 | $1,000 |
$943
16,706
kWh
|
$196
-
kW-mo/yr
|
- | - | - | - | |
05 | 4.441: Install automatic packing equipment | $10,800 | $30,000 | - | - | - | $10,800 | - | - | |
06 | 4.821: Pay bills on time to avoid late fees | $432 | - | - | - | - | - | $432 | - | |
07 | 3.7132: Reuse rags until completely soiled | $432 | - | - | - | - | - | - | $432 | |
08 | 3.5311: Recover and reuse waste material | $36,000 | $80,000 | - | - |
$36,000
-
lb
|
- | - | - | |
TOTAL RECOMMENDED | $53,476 | $117,329 |
$4,704
82,943
kWh
|
$1,108
-
kW-mo/yr
|
$36,000
-
lb
|
$10,800 | $432 | $432 | ||
TOTAL IMPLEMENTED | $47,232 | $110,000 | - | - |
$36,000
-
lb
|
$10,800 | $432 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs