ITAC Assessment: OK0321
ITAC logo
ITAC Assessment: OK0321
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product DOOR ENTRY COMPONENTS
NAICS
n/a
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area
n/a
Annual Production 480,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $359,905 5,868,992
kWh
Natural Gas $22,369 7,065
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,036 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,229

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $39,907 $25,000 $52,548
934,936
kWh
$(-12,641.0)
-
MMBtu
-
02 2.2437: Recover waste heat from equipment $8,220 $2,876 - $8,220
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,356 $19,970 $5,243
93,200
kWh
- $1,113
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $451 $502 $451
7,913
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $102 - $102
4,103
kWh
- -
TOTAL RECOMMENDED $55,036 $48,348 $58,344
1,040,152
kWh
$(-4,421.0)
-
MMBtu
$1,113
TOTAL IMPLEMENTED $48,229 $27,876 $52,650
939,039
kWh
$(-4,421.0)
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs