ITAC Assessment: NC0584
ITAC logo
ITAC Assessment: NC0584
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Plastic injection molding
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 82,000
ft2
Annual Production 1,700,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $174,024 3,298,800
kWh
Electricity Demand $64,323 7,378
kW-mo/yr
Electricity Fees $(-17,447.0) -
TOTAL YEARLY COSTS $220,900
RECOMMENDED SAVINGS* $33,209 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $885

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,183 $21,035 $7,467
141,151
kWh
$2,716
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,714 $26,550 $3,846
72,712
kWh
$1,868
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $959 $3,905 $959
18,146
kWh
- - -
04 2.7135: Install occupancy sensors $1,083 $1,785 $1,083
20,480
kWh
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $885 $200 $1,247
23,580
kWh
$418
-
kW-mo/yr
$(-300.0) $(-480.0)
06 2.4224: Upgrade controls on compressors $13,915 $20,000 $10,423
197,032
kWh
$3,492
-
kW-mo/yr
- -
07 2.2511: Insulate bare equipment $470 $340 $470
8,899
kWh
- - -
TOTAL RECOMMENDED $33,209 $73,815 $25,495
482,000
kWh
$8,494
-
kW-mo/yr
$(-300.0) $(-480.0)
TOTAL IMPLEMENTED $885 $200 $1,247
23,580
kWh
$418
-
kW-mo/yr
$(-300.0) $(-480.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs