ITAC Assessment: NC0583
ITAC logo
ITAC Assessment: NC0583
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Milk
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range $50
M
to 100
M
# of Employees 80
Plant Area 96,000
ft2
Annual Production 33,000
Tgal
Production Hrs. Annual 4,160
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $664,426 8,586,312
kWh
Electricity Demand $124,537 22,607
kW-mo/yr
Electricity Fees $651 -
Natural Gas $185,200 39,000
MMBtu
TOTAL YEARLY COSTS $974,814
RECOMMENDED SAVINGS* $80,527 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,738

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2437: Recover waste heat from equipment $61,111 $160,000 $6,230
81,438
kWh
$636
-
kW-mo/yr
$54,245
-
MMBtu
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,519 $6,412 $5,573
72,848
kWh
$568
-
kW-mo/yr
- - $378
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,025 $200 $1,484
19,400
kWh
$321
-
kW-mo/yr
- $(-300.0) $(-480.0)
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,222 $100 $1,830
23,920
kWh
$392
-
kW-mo/yr
- - -
05 2.2437: Recover waste heat from equipment $6,456 $7,000 - - $6,456
-
MMBtu
- -
06 2.4151: Develop a repair/replace policy $2,529 $5,865 $2,082
27,218
kWh
$447
-
kW-mo/yr
- - -
07 2.2123: Insulate feedwater tank $665 $1,106 - - $665
-
MMBtu
- -
TOTAL RECOMMENDED $80,527 $180,683 $17,199
224,824
kWh
$2,364
-
kW-mo/yr
$61,366
-
MMBtu
$(-300.0) $(-102.0)
TOTAL IMPLEMENTED $10,738 $13,583 $9,139
119,466
kWh
$1,336
-
kW-mo/yr
$665
-
MMBtu
$(-300.0) $(-102.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs