ITAC Assessment: NC0574
ITAC logo
ITAC Assessment: NC0574
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Insulin
NAICS 325411: Medicinal and Botanical Manufacturing
SIC 2833: Medicinal Chemicals and Botanical Products
Sales Range greater than $500
M
# of Employees 350
Plant Area 99,500
ft2
Annual Production 150,000,000
units
Production Hrs. Annual 8,400
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,218,244 26,024,000
kWh
Electricity Demand $676,095 42,556
kW-mo/yr
Natural Gas $579,107 111,958
MMBtu
TOTAL YEARLY COSTS $2,473,446
RECOMMENDED SAVINGS* $202,927 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $141,484

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $138,968 $500 $138,968
-
kWh
- - -
02 2.2612: Use cooling tower water instead of refrigeration $15,850 $30,000 $10,634
225,288
kWh
$5,216
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $1,055 $1,605 $707
14,986
kWh
$348
-
kW-mo/yr
- -
04 2.2437: Recover waste heat from equipment $33,367 $49,000 $11,243
238,193
kWh
$5,508
-
kW-mo/yr
$16,616
-
MMBtu
-
05 2.2113: Repair or replace steam traps $11,171 $2,250 - - $11,171
-
MMBtu
-
06 2.7134: Use photocell controls $1,303 $150 $598
12,670
kWh
$705
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,150 $5,360 $984
20,849
kWh
- - $166
08 2.7135: Install occupancy sensors $63 $50 $63
1,340
kWh
- - -
TOTAL RECOMMENDED $202,927 $88,915 $163,197
513,326
kWh
$11,777
-
kW-mo/yr
$27,787
-
MMBtu
$166
TOTAL IMPLEMENTED $141,484 $6,060 $140,613
34,859
kWh
$705
-
kW-mo/yr
- $166
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs