| Assessment Year | 2016 |
|---|---|
| Principal Product | Recycled plastic pellets |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 125 |
| Plant Area |
117,000
ft2
|
| Annual Production | 72,000,000
lb
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $811,838 | 19,452,000 |
kWh
|
$0.042 |
| Electricity Demand | $345,513 | 30,951 |
kW-mo/yr
|
$11.16 |
| Electricity Fees | $(-75,117.0) | - |
|
- |
| Natural Gas | $69,117 | 8,682 |
MMBtu
|
$7.96 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $137,115 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $46,324 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.8114: Change rate schedules or other changes in utility service | $84,927 | $200 |
$84,927
-
kWh
|
- | - | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $30,556 | $36,876 |
$19,302
462,874
kWh
|
$7,379
-
kW-mo/yr
|
- | $3,875 | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,668 | $27,490 |
$4,505
108,037
kWh
|
$2,510
-
kW-mo/yr
|
- | $1,653 | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $910 | $2,559 |
$480
11,519
kWh
|
- | - | $430 | |
| 05 | 2.7135: Install occupancy sensors | $425 | $1,071 |
$425
10,196
kWh
|
- | - | - | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,735 | $300 |
$3,266
78,330
kWh
|
$1,249
-
kW-mo/yr
|
$(-300.0) | $(-480.0) | |
| 07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,696 | $100 |
$1,950
46,768
kWh
|
$746
-
kW-mo/yr
|
- | - | |
| 08 | 2.4151: Develop a repair/replace policy | $3,168 | $5,865 |
$2,292
54,960
kWh
|
$876
-
kW-mo/yr
|
- | - | |
| 09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,030 | $230 |
$1,469
35,216
kWh
|
$561
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $137,115 | $74,691 |
$118,616
807,900
kWh
|
$13,321
-
kW-mo/yr
|
$(-300.0) | $5,478 | ||
| TOTAL IMPLEMENTED | $46,324 | $68,526 |
$29,447
706,172
kWh
|
$11,699
-
kW-mo/yr
|
$(-300.0) | $5,478 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs