ITAC Assessment: NC0562
ITAC logo
ITAC Assessment: NC0562
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Brass plumbing fittings
NAICS 332913: Plumbing Fixture Fitting and Trim Manufacturing
SIC 3432: Plumbing Fixture Fittings and Trim
Sales Range $100
M
to 500
M
# of Employees 370
Plant Area 304,000
ft2
Annual Production 13,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,068,235 32,141,282
kWh
Electricity Demand $124,350 100,908
kW-mo/yr
Natural Gas $644,389 105,426
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $123,077 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,201

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4224: Upgrade controls on compressors $47,821 $40,000 $47,821
743,710
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $21,093 $200 $21,873
340,176
kWh
$(-300.0) $(-480.0)
03 2.2612: Use cooling tower water instead of refrigeration $29,861 $3,000 $29,861
541,800
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $10,108 $100 $10,108
157,200
kWh
- -
05 2.4239: Eliminate or reduce compressed air usage $12,750 $8,750 $12,750
198,750
kWh
- -
06 2.4239: Eliminate or reduce compressed air usage $399 $900 $399
6,210
kWh
- -
07 2.7111: Reduce illumination to minimum necessary levels $1,045 $900 $1,045
14,688
kWh
- -
TOTAL RECOMMENDED $123,077 $53,850 $123,857
2,002,534
kWh
$(-300.0) $(-480.0)
TOTAL IMPLEMENTED $31,201 $300 $31,981
497,376
kWh
$(-300.0) $(-480.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs