Assessment Year | 2015 |
---|---|
Principal Product | Molded rubber |
NAICS | 339991: Gasket, Packing, and Sealing Device Manufacturing |
SIC | 3053: Gaskets, Packing, and Sealing Devices |
Sales Range | $10 M to 50M |
# of Employees | 35 |
Plant Area |
26,250
ft2
|
Annual Production | 500,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $244,258 | 5,846,400 |
kWh
|
$0.042 |
Electricity Demand | $237,812 | 12,208 |
kW-mo/yr
|
$19.48 |
Natural Gas | $60,969 | 7,065 |
MMBtu
|
$8.63 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $123,577 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $29,030 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $28,923 | $17,820 |
$14,968
358,080
kWh
|
$13,955
-
kW-mo/yr
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,925 | $300 |
$3,471
83,030
kWh
|
$3,234
-
kW-mo/yr
|
- | $(-300.0) | $(-480.0) | |
03 | 2.2437: Recover waste heat from equipment | $16,078 | $5,000 | - | - |
$16,078
-
MMBtu
|
- | - | |
04 | 2.4239: Eliminate or reduce compressed air usage | $1,981 | $1,000 |
$1,025
24,540
kWh
|
$956
-
kW-mo/yr
|
- | - | - | |
05 | 2.4226: Use / purchase optimum sized compressor | $3,947 | $6,425 |
$3,947
94,415
kWh
|
- | - | - | - | |
06 | 2.4239: Eliminate or reduce compressed air usage | $44 | $120 |
$44
1,056
kWh
|
- | - | - | - | |
07 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $63,599 | $250,000 |
$45,079
1,078,423
kWh
|
$60,833
-
kW-mo/yr
|
$(-42,313.0)
-
MMBtu
|
- | - | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,031 | $227 |
$1,051
25,154
kWh
|
$980
-
kW-mo/yr
|
- | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $296 | $80 |
$89
2,135
kWh
|
$57
-
kW-mo/yr
|
- | - | $150 | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $288 | $372 |
$138
3,294
kWh
|
$128
-
kW-mo/yr
|
- | - | $22 | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $145 | $716 |
$57
1,361
kWh
|
$88
-
kW-mo/yr
|
- | - | - | |
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $320 | $1,595 |
$274
6,552
kWh
|
- | - | - | $46 | |
TOTAL RECOMMENDED | $123,577 | $283,655 |
$70,143
1,678,040
kWh
|
$80,231
-
kW-mo/yr
|
$(-26,235.0)
-
MMBtu
|
$(-300.0) | $(-262.0) | ||
TOTAL IMPLEMENTED | $29,030 | $14,715 |
$9,027
215,941
kWh
|
$4,487
-
kW-mo/yr
|
$16,078
-
MMBtu
|
$(-300.0) | $(-262.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs