ITAC Assessment: NC0557
ITAC logo
ITAC Assessment: NC0557
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Contact lens solution
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range greater than $500
M
# of Employees 450
Plant Area 220,000
ft2
Annual Production 168,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $789,026 21,339,253
kWh
Electricity Demand $342,451 33,777
kW-mo/yr
Natural Gas $676,793 115,727
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,195 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.4226: Use / purchase optimum sized compressor $40,351 $30,000 $28,913
781,420
kWh
$11,438
-
kW-mo/yr
- -
02 2.2135: Repair and eliminate steam leaks $4,345 $1,000 - - $4,345
-
MMBtu
-
03 2.3132: Recharge batteries on during off-peak demand periods $2,307 $200 $2,307
-
kWh
- - -
04 2.4221: Install compressor air intakes in coolest locations $3,783 $3,000 $3,038
82,109
kWh
$745
-
kW-mo/yr
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,813 $93 $1,303
35,216
kWh
$510
-
kW-mo/yr
- -
06 2.7111: Reduce illumination to minimum necessary levels $1,206 $38 $867
23,436
kWh
$339
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $139 $640 $73
1,966
kWh
$28
-
kW-mo/yr
- $38
08 2.7142: Utilize higher efficiency lamps and/or ballasts $251 $1,040 $194
5,256
kWh
- - $57
TOTAL RECOMMENDED $54,195 $36,011 $36,695
929,403
kWh
$13,060
-
kW-mo/yr
$4,345
-
MMBtu
$95
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs