Assessment Year | 2015 |
---|---|
Principal Product | Extruded plastics |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 75 |
Plant Area |
111,327
ft2
|
Annual Production | 2,000,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $394,353 | 9,622,800 |
kWh
|
$0.041 |
Electricity Demand | $285,963 | 16,951 |
kW-mo/yr
|
$16.87 |
Natural Gas | $33,725 | 3,782 |
MMBtu
|
$8.92 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $43,804 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,507 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,085 | $12,500 |
$5,085
124,030
kWh
|
- | - | - | - | |
02 | 2.2511: Insulate bare equipment | $10,751 | $8,568 |
$10,751
262,208
kWh
|
- | - | - | - | |
03 | 2.2437: Recover waste heat from equipment | $1,597 | $4,400 | - | - |
$1,597
-
MMBtu
|
- | - | |
04 | 2.2437: Recover waste heat from equipment | $8,465 | $12,000 | - | - |
$8,465
-
MMBtu
|
- | - | |
05 | 2.7313: Recycle air for heating, ventilation and air conditioning | $3,916 | $4,500 | - | - |
$3,916
-
MMBtu
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,384 | $100 |
$4,019
98,024
kWh
|
$2,265
-
kW-mo/yr
|
- | $(-600.0) | $(-300.0) | |
07 | 2.4239: Eliminate or reduce compressed air usage | $5,043 | $9,000 |
$2,371
57,834
kWh
|
$2,672
-
kW-mo/yr
|
- | - | - | |
08 | 2.4239: Eliminate or reduce compressed air usage | $147 | $150 |
$147
3,594
kWh
|
- | - | - | - | |
09 | 2.7111: Reduce illumination to minimum necessary levels | $587 | $100 |
$345
8,410
kWh
|
$194
-
kW-mo/yr
|
- | - | $48 | |
10 | 2.4151: Develop a repair/replace policy | $2,829 | $4,258 |
$1,809
44,123
kWh
|
$1,020
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $43,804 | $55,576 |
$24,527
598,223
kWh
|
$6,151
-
kW-mo/yr
|
$13,978
-
MMBtu
|
$(-600.0) | $(-252.0) | ||
TOTAL IMPLEMENTED | $23,507 | $33,408 |
$11,060
269,771
kWh
|
$3,285
-
kW-mo/yr
|
$10,062
-
MMBtu
|
$(-600.0) | $(-300.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs