ITAC Assessment: NC0550
ITAC logo
ITAC Assessment: NC0550
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Truck bodies
NAICS 336211: Motor Vehicle Body Manufacturing
SIC 3713: Truck and Bus Bodies
Sales Range $10
M
to 50
M
# of Employees 156
Plant Area 250,000
ft2
Annual Production 450
pieces
Production Hrs. Annual 2,250
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $136,763 1,295,540
kWh
Electricity Demand $41,486 5,456
kW-mo/yr
Natural Gas $57,335 7,277
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,261 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,391

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $18,953 $23,900 $9,315
124,209
kWh
$9,638
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $634 $100 $449
5,992
kWh
$465
-
kW-mo/yr
- $(-100.0) $(-180.0)
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,820 $100 $894
11,925
kWh
$926
-
kW-mo/yr
- - -
04 2.2437: Recover waste heat from equipment $2,519 $2,100 - - $2,519
-
MMBtu
- -
05 2.4239: Eliminate or reduce compressed air usage $3,444 $2,700 $703
12,657
kWh
$2,741
-
kW-mo/yr
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,015 $984 $1,404
12,562
kWh
$383
-
kW-mo/yr
- - $228
07 2.7142: Utilize higher efficiency lamps and/or ballasts $17,742 $46,719 $13,943
120,825
kWh
$3,574
-
kW-mo/yr
- - $225
08 2.7134: Use photocell controls $382 $150 $382
5,100
kWh
- - - -
09 2.7135: Install occupancy sensors $316 $868 $316
2,542
kWh
- - - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $1,426 $4,394 $1,426
9,198
kWh
- - - -
11 2.4322: Use or replace with energy efficient substitutes $3,900 $18,900 $3,900
47,544
kWh
- - - -
12 2.7224: Reduce space conditioning during non-working hours $381 $525 $381
2,460
kWh
- - - -
13 2.4151: Develop a repair/replace policy $1,729 $4,256 $850
11,333
kWh
$879
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $55,261 $105,696 $33,963
366,347
kWh
$18,606
-
kW-mo/yr
$2,519
-
MMBtu
$(-100.0) $273
TOTAL IMPLEMENTED $20,391 $47,803 $15,796
139,379
kWh
$4,422
-
kW-mo/yr
- $(-100.0) $273
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs