ITAC Assessment: NC0495
ITAC logo
ITAC Assessment: NC0495
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Case goods furniture
NAICS 337122: Nonupholstered Wood Household Furniture Manufacturing
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $50
M
to 100
M
# of Employees 430
Plant Area 806,000
ft2
Annual Production 129,620
pieces
Production Hrs. Annual 2,125
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $628,140 11,887,140
kWh
Electricity Demand $178,688 43,900
kW-mo/yr
Electricity Fees $249 -
Natural Gas $134,432 16,600
MMBtu
Coal $193,722 65,312
MMBtu
Wood $29,997 57,420
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,029 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7135: Install occupancy sensors $1,753 $5,222 $1,753
33,187
kWh
- - - -
02 2.7131: Add area lighting switches $3,238 $1,650 $3,238
61,312
kWh
- - - -
03 2.7134: Use photocell controls $4,114 $7,500 $2,657
50,303
kWh
$1,457
-
kW-mo/yr
- - -
04 2.7134: Use photocell controls $615 $3,797 $434
8,211
kWh
$190
-
kW-mo/yr
- - $(-9.0)
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,495 $1,041 $1,734
32,820
kWh
$761
-
kW-mo/yr
- - -
06 2.4151: Develop a repair/replace policy $813 $3,663 $565
10,703
kWh
$248
-
kW-mo/yr
- - -
07 2.4239: Eliminate or reduce compressed air usage $8,730 $60,000 $6,068
114,931
kWh
$2,662
-
kW-mo/yr
- - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $748 $100 $879
16,645
kWh
$259
-
kW-mo/yr
- $(-150.0) $(-240.0)
09 2.4239: Eliminate or reduce compressed air usage $123 $600 $123
2,320
kWh
- - - -
10 2.2121: Increase amount of condensate returned $1,400 $100 - - $1,400
-
Tgal
- -
TOTAL RECOMMENDED $24,029 $83,673 $17,451
330,432
kWh
$5,577
-
kW-mo/yr
$1,400
-
Tgal
$(-150.0) $(-249.0)
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs