ITAC Assessment: NC0490
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Specialty chemicals
NAICS 325199: All Other Basic Organic Chemical Manufacturing
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 30,000
ft2
Annual Production 20,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $617,046 8,261,084
kWh
Electricity Demand $97,662 16,503
kW-mo/yr
Electricity Fees $4,425 -
Natural Gas $596,339 133,650
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,015 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,634

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,689 $7,449 $3,509
46,980
kWh
$417
-
kW-mo/yr
- - $763
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,248 $4,989 $1,121
15,011
kWh
$127
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $213 $381 $147
1,971
kWh
$16
-
kW-mo/yr
- - $50
04 2.7135: Install occupancy sensors $2,692 $1,922 $2,692
36,034
kWh
- - - -
05 2.2622: Replace existing chiller with high efficiency model $15,690 $65,000 $11,713
156,800
kWh
$3,977
-
kW-mo/yr
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $633 $50 $1,053
14,099
kWh
$120
-
kW-mo/yr
- $(-300.0) $(-240.0)
07 2.4151: Develop a repair/replace policy $1,508 $1,217 $1,355
18,133
kWh
$153
-
kW-mo/yr
- - -
08 2.2113: Repair or replace steam traps $3,207 $5,500 - - $5,947
-
MMBtu
$(-340.0) $(-2,400.0)
09 2.2136: Install / repair insulation on steam lines $2,135 $2,192 - - $2,135
-
MMBtu
- -
TOTAL RECOMMENDED $32,015 $88,700 $21,590
289,028
kWh
$4,810
-
kW-mo/yr
$8,082
-
MMBtu
$(-640.0) $(-1,827.0)
TOTAL IMPLEMENTED $24,634 $79,329 $15,389
206,014
kWh
$4,393
-
kW-mo/yr
$8,082
-
MMBtu
$(-640.0) $(-2,590.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs