Assessment Year | 2013 |
---|---|
Principal Product | Aircraft maintenance |
NAICS | 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing |
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 3,000 |
Plant Area |
1,460,000
ft2
|
Annual Production | 1
pieces
|
Production Hrs. Annual | 4,400
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $6,186,024 | 86,992,315 |
kWh
|
$0.071 |
Other Energy | $3,600,922 | 210,950 |
MMBtu
|
$17.07 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $399,219 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $225,167 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Other Energy Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $35,649 | $108,665 |
$37,810
531,714
kWh
|
- | - | $(-2,161.0) | |
02 | 2.7135: Install occupancy sensors | $2,016 | $7,315 |
$2,016
28,350
kWh
|
- | - | - | |
03 | 2.7134: Use photocell controls | $2,647 | $3,750 |
$2,647
37,230
kWh
|
- | - | - | |
04 | 2.2113: Repair or replace steam traps | $167,046 | $6,100 | - |
$180,046
-
MMBtu
|
$(-1,000.0) | $(-12,000.0) | |
05 | 2.2136: Install / repair insulation on steam lines | $2,936 | $300 | - |
$2,936
-
MMBtu
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $17,809 | $100 |
$28,009
393,888
kWh
|
- | $(-9,000.0) | $(-1,200.0) | |
07 | 2.4226: Use / purchase optimum sized compressor | $148,178 | $100,000 |
$148,178
2,084,080
kWh
|
- | - | - | |
08 | 2.2437: Recover waste heat from equipment | $22,938 | $75,000 | - |
$22,938
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $399,219 | $301,230 |
$218,660
3,075,262
kWh
|
$205,920
-
MMBtu
|
$(-10,000.0) | $(-15,361.0) | ||
TOTAL IMPLEMENTED | $225,167 | $125,930 |
$70,482
991,182
kWh
|
$180,046
-
MMBtu
|
$(-10,000.0) | $(-15,361.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Other Energy Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs