ITAC Assessment: NC0485
ITAC logo
ITAC Assessment: NC0485
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Aircraft maintenance
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 3,000
Plant Area 1,460,000
ft2
Annual Production 1
pieces
Production Hrs. Annual 4,400
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $6,186,024 86,992,315
kWh
Other Energy $3,600,922 210,950
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $399,219 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $225,167

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Energy Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $35,649 $108,665 $37,810
531,714
kWh
- - $(-2,161.0)
02 2.7135: Install occupancy sensors $2,016 $7,315 $2,016
28,350
kWh
- - -
03 2.7134: Use photocell controls $2,647 $3,750 $2,647
37,230
kWh
- - -
04 2.2113: Repair or replace steam traps $167,046 $6,100 - $180,046
-
MMBtu
$(-1,000.0) $(-12,000.0)
05 2.2136: Install / repair insulation on steam lines $2,936 $300 - $2,936
-
MMBtu
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,809 $100 $28,009
393,888
kWh
- $(-9,000.0) $(-1,200.0)
07 2.4226: Use / purchase optimum sized compressor $148,178 $100,000 $148,178
2,084,080
kWh
- - -
08 2.2437: Recover waste heat from equipment $22,938 $75,000 - $22,938
-
MMBtu
- -
TOTAL RECOMMENDED $399,219 $301,230 $218,660
3,075,262
kWh
$205,920
-
MMBtu
$(-10,000.0) $(-15,361.0)
TOTAL IMPLEMENTED $225,167 $125,930 $70,482
991,182
kWh
$180,046
-
MMBtu
$(-10,000.0) $(-15,361.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Other Energy Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs