| Assessment Year | 2013 |
|---|---|
| Principal Product | Wood door frames |
| NAICS | 321911: Wood Window and Door Manufacturing |
| SIC | 2431: Millwork |
| Sales Range | $10 M to 50M |
| # of Employees | 150 |
| Plant Area |
62,992
ft2
|
| Annual Production | 50,000
pieces
|
| Production Hrs. Annual | 4,500
hrs
|
| Location (State) | Virginia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $322,176 | 9,145,880 |
kWh
|
$0.035 |
| Electricity Demand | $414,489 | 20,881 |
kW-mo/yr
|
$19.85 |
| Wood | $1 | 200,000 |
MMBtu
|
$0.000 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $30,333 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $26,636 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,338 | $100 |
$5,710
159,596
kWh
|
$5,428
-
kW-mo/yr
|
$(-1,200.0) | $(-600.0) | |
| 02 | 2.4239: Eliminate or reduce compressed air usage | $1,603 | $1,200 |
$789
22,040
kWh
|
$814
-
kW-mo/yr
|
- | - | |
| 03 | 2.4225: Install common header on compressors | $2,363 | $7,500 |
$1,182
33,028
kWh
|
$1,181
-
kW-mo/yr
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,333 | $3,110 |
$5,671
158,508
kWh
|
$8,852
-
kW-mo/yr
|
- | $(-190.0) | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,229 | $4,819 |
$480
13,419
kWh
|
$749
-
kW-mo/yr
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $865 | $955 |
$206
5,746
kWh
|
$165
-
kW-mo/yr
|
- | $494 | |
| 07 | 2.7135: Install occupancy sensors | $602 | $750 |
$602
16,830
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $30,333 | $18,434 |
$14,640
409,167
kWh
|
$17,189
-
kW-mo/yr
|
$(-1,200.0) | $(-296.0) | ||
| TOTAL IMPLEMENTED | $26,636 | $11,460 |
$13,165
367,962
kWh
|
$15,461
-
kW-mo/yr
|
$(-1,200.0) | $(-790.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs