ITAC Assessment: NC0479
ITAC logo
ITAC Assessment: NC0479
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Pharmaceuticals
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $10
M
to 50
M
# of Employees 220
Plant Area 180,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 4,800
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $244,638 3,972,864
kWh
Electricity Demand $27,999 8,418
kW-mo/yr
Electricity Fees $2,963 -
Natural Gas $30,200 4,143
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,938 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,838

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,663 $40,000 $9,401
152,670
kWh
$262
-
kW-mo/yr
- - -
02 2.4226: Use / purchase optimum sized compressor $6,601 $10,000 $6,327
102,742
kWh
$274
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,261 $100 $1,549
25,160
kWh
$132
-
kW-mo/yr
- $(-300.0) $(-120.0)
04 2.2437: Recover waste heat from equipment $1,378 $3,750 - - $1,378
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $99 $351 $79
1,286
kWh
$22
-
kW-mo/yr
- - $(-2.0)
06 2.7142: Utilize higher efficiency lamps and/or ballasts $238 $1,102 $207
3,355
kWh
$31
-
kW-mo/yr
- - -
07 2.7134: Use photocell controls $106 $250 $90
1,456
kWh
$16
-
kW-mo/yr
- - -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,059 $2,867 $914
14,843
kWh
$145
-
kW-mo/yr
- - -
09 2.2511: Insulate bare equipment $533 $350 $113
1,839
kWh
$18
-
kW-mo/yr
$402
-
MMBtu
- -
TOTAL RECOMMENDED $20,938 $58,770 $18,680
303,351
kWh
$900
-
kW-mo/yr
$1,780
-
MMBtu
$(-300.0) $(-122.0)
TOTAL IMPLEMENTED $8,838 $12,153 $8,365
135,838
kWh
$493
-
kW-mo/yr
$402
-
MMBtu
$(-300.0) $(-122.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs