ITAC Assessment: NC0476
ITAC logo
ITAC Assessment: NC0476
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Fiberglass boats
NAICS 336612: Boat Building
SIC 3732: Boat Building and Repairing
Sales Range $100
M
to 500
M
# of Employees 280
Plant Area 355,000
ft2
Annual Production 20
pieces
Production Hrs. Annual 2,400
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $367,920 7,200,000
kWh
Electricity Demand $100,434 23,006
kW-mo/yr
Electricity Fees $89,102 -
Natural Gas $120,910 21,887
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $711,192 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $704,314

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4226: Use / purchase optimum sized compressor $6,129 $5,000 $5,126
100,320
kWh
$1,003
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $435 $100 $615
12,031
kWh
$240
-
kW-mo/yr
- $(-300.0) $(-120.0)
03 2.2437: Recover waste heat from equipment $1,322 $2,500 - - $1,322
-
MMBtu
- -
04 2.7135: Install occupancy sensors $9,719 $3,000 $9,719
190,186
kWh
- - - -
05 2.7313: Recycle air for heating, ventilation and air conditioning $5,556 $7,000 $1,053
20,600
kWh
$1,296
-
kW-mo/yr
$3,207
-
MMBtu
- -
06 4.452: Eliminate shift $688,031 $25,000 $13,031
255,000
kWh
- - $675,000 -
TOTAL RECOMMENDED $711,192 $42,600 $29,544
578,137
kWh
$2,539
-
kW-mo/yr
$4,529
-
MMBtu
$674,700 $(-120.0)
TOTAL IMPLEMENTED $704,314 $33,100 $28,491
557,537
kWh
$1,243
-
kW-mo/yr
- $674,700 $(-120.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs