Assessment Year | 2012 |
---|---|
Principal Product | Fiber reinforced plastics |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 376 |
Plant Area |
549,000
ft2
|
Annual Production | 45,000,000
lb
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $557,574 | 10,310,500 |
kWh
|
$0.054 |
Electricity Demand | $239,409 | 18,481 |
kW-mo/yr
|
$12.95 |
Electricity Fees | $11,678 | - |
|
- |
Natural Gas | $62,160 | 8,180 |
MMBtu
|
$7.60 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $94,290 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $58,917 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,060 | $800 |
$5,185
101,829
kWh
|
$1,905
-
kW-mo/yr
|
- | $(-1,452.0) | $(-578.0) | |
02 | 2.2437: Recover waste heat from equipment | $17,026 | $18,000 |
$(-290.0)
(-6,261)
kWh
|
$(-121.0)
-
kW-mo/yr
|
$17,437
-
MMBtu
|
- | - | |
03 | 2.4239: Eliminate or reduce compressed air usage | $785 | $900 |
$785
12,503
kWh
|
- | - | - | - | |
04 | 2.4225: Install common header on compressors | $16,574 | $8,026 |
$12,561
219,324
kWh
|
$4,013
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $464 | $2,021 |
$464
8,106
kWh
|
- | - | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $867 | $1,668 |
$577
13,532
kWh
|
$265
-
kW-mo/yr
|
- | - | $25 | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $289 | $715 |
$106
1,856
kWh
|
$102
-
kW-mo/yr
|
- | - | $81 | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $128 | $301 |
$52
910
kWh
|
$50
-
kW-mo/yr
|
- | - | $26 | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,973 | $2,136 |
$635
12,844
kWh
|
$234
-
kW-mo/yr
|
- | - | $1,104 | |
10 | 2.7111: Reduce illumination to minimum necessary levels | $14,293 | $4,125 |
$9,109
166,320
kWh
|
$3,080
-
kW-mo/yr
|
- | - | $2,104 | |
11 | 2.7135: Install occupancy sensors | $2,082 | $2,100 |
$2,082
41,458
kWh
|
- | - | - | - | |
12 | 2.7313: Recycle air for heating, ventilation and air conditioning | $34,749 | $7,000 |
$1,913
33,400
kWh
|
$4,265
-
kW-mo/yr
|
$28,571
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $94,290 | $47,792 |
$33,179
605,821
kWh
|
$13,793
-
kW-mo/yr
|
$46,008
-
MMBtu
|
$(-1,452.0) | $2,762 | ||
TOTAL IMPLEMENTED | $58,917 | $27,900 |
$8,890
170,426
kWh
|
$6,049
-
kW-mo/yr
|
$46,008
-
MMBtu
|
$(-1,452.0) | $(-578.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs