Assessment Year | 2012 |
---|---|
Principal Product | Plastic parts |
NAICS | 326160: Plastics Bottle Manufacturing |
SIC | 3085: Plastics Bottles |
Sales Range | $10 M to 50M |
# of Employees | 51 |
Plant Area |
51,200
ft2
|
Annual Production | 2,600,000
lb
|
Production Hrs. Annual | 8,700
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $412,302 | 7,145,611 |
kWh
|
$0.058 |
Electricity Demand | $236,559 | 13,034 |
kW-mo/yr
|
$18.15 |
Electricity Fees | $7,416 | - |
|
- |
Natural Gas | $5,677 | 626 |
MMBtu
|
$9.07 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $134,745 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $132,161 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $17,379 | $2,419 |
$10,151
175,934
kWh
|
$7,228
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $1,681 | $1,600 |
$1,119
19,396
kWh
|
$562
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $294 | $383 |
$100
1,735
kWh
|
$194
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,649 | $100 |
$1,657
28,710
kWh
|
$832
-
kW-mo/yr
|
- | $(-600.0) | - | $(-240.0) | |
05 | 2.7124: Make a practice of turning off lights when not needed | $452 | $50 |
$301
5,220
kWh
|
$151
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.7135: Install occupancy sensors | $157 | $350 |
$157
2,717
kWh
|
- | - | - | - | - | |
07 | 2.3192: Use fossil fuel powered generator during peak demand periods | $113,133 | $50,000 |
$3,486
60,366
kWh
|
$138,842
-
kW-mo/yr
|
$(-19,195.0)
-
MMBtu
|
- | $(-10,000.0) | - | |
TOTAL RECOMMENDED | $134,745 | $54,902 |
$16,971
294,078
kWh
|
$147,809
-
kW-mo/yr
|
$(-19,195.0)
-
MMBtu
|
$(-600.0) | $(-10,000.0) | $(-240.0) | ||
TOTAL IMPLEMENTED | $132,161 | $52,519 |
$15,294
265,010
kWh
|
$146,902
-
kW-mo/yr
|
$(-19,195.0)
-
MMBtu
|
$(-600.0) | $(-10,000.0) | $(-240.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs