ITAC Assessment: NC0455
ITAC logo
ITAC Assessment: NC0455
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Plastic parts
NAICS 326160: Plastics Bottle Manufacturing
SIC 3085: Plastics Bottles
Sales Range $10
M
to 50
M
# of Employees 51
Plant Area 51,200
ft2
Annual Production 2,600,000
lb
Production Hrs. Annual 8,700
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $412,302 7,145,611
kWh
Electricity Demand $236,559 13,034
kW-mo/yr
Electricity Fees $7,416 -
Natural Gas $5,677 626
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $134,745 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $132,161

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.2511: Insulate bare equipment $17,379 $2,419 $10,151
175,934
kWh
$7,228
-
kW-mo/yr
- - - -
02 2.4221: Install compressor air intakes in coolest locations $1,681 $1,600 $1,119
19,396
kWh
$562
-
kW-mo/yr
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $294 $383 $100
1,735
kWh
$194
-
kW-mo/yr
- - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,649 $100 $1,657
28,710
kWh
$832
-
kW-mo/yr
- $(-600.0) - $(-240.0)
05 2.7124: Make a practice of turning off lights when not needed $452 $50 $301
5,220
kWh
$151
-
kW-mo/yr
- - - -
06 2.7135: Install occupancy sensors $157 $350 $157
2,717
kWh
- - - - -
07 2.3192: Use fossil fuel powered generator during peak demand periods $113,133 $50,000 $3,486
60,366
kWh
$138,842
-
kW-mo/yr
$(-19,195.0)
-
MMBtu
- $(-10,000.0) -
TOTAL RECOMMENDED $134,745 $54,902 $16,971
294,078
kWh
$147,809
-
kW-mo/yr
$(-19,195.0)
-
MMBtu
$(-600.0) $(-10,000.0) $(-240.0)
TOTAL IMPLEMENTED $132,161 $52,519 $15,294
265,010
kWh
$146,902
-
kW-mo/yr
$(-19,195.0)
-
MMBtu
$(-600.0) $(-10,000.0) $(-240.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings