ITAC Assessment: NC0447
ITAC logo
ITAC Assessment: NC0447
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Pre-cast concrete
NAICS 327390: Other Concrete Product Manufacturing
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $50
M
to 100
M
# of Employees 175
Plant Area 220,000
ft2
Annual Production 85,000
thousand feet
Production Hrs. Annual 4,200
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $129,992 4,019,885
kWh
Electricity Demand $153,440 17,966
kW-mo/yr
Natural Gas $193,829 27,368
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,654 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,363

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $2,468 $500 $(-218.0)
-
kWh
$2,686
-
kW-mo/yr
- - -
02 2.2511: Insulate bare equipment $17,983 $2,000 $6,597
204,000
kWh
$5,226
-
kW-mo/yr
$6,160
-
MMBtu
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,895 $400 $2,127
65,783
kWh
$918
-
kW-mo/yr
- $(-150.0) -
04 2.2123: Insulate feedwater tank $339 $1,133 - - $339
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $14,779 $84,121 $9,338
288,742
kWh
$7,051
-
kW-mo/yr
- - $(-1,610.0)
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,190 $399 $470
14,529
kWh
$720
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $39,654 $88,553 $18,314
573,054
kWh
$16,601
-
kW-mo/yr
$6,499
-
MMBtu
$(-150.0) $(-1,610.0)
TOTAL IMPLEMENTED $5,363 $900 $1,909
65,783
kWh
$3,604
-
kW-mo/yr
- $(-150.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs