Assessment Year | 2012 |
---|---|
Principal Product | Pre-cast concrete |
NAICS | 327390: Other Concrete Product Manufacturing |
SIC | 3272: Concrete Products, Except Block and Brick |
Sales Range | $50 M to 100M |
# of Employees | 175 |
Plant Area |
220,000
ft2
|
Annual Production | 85,000
thousand feet
|
Production Hrs. Annual | 4,200
hrs
|
Location (State) | South Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $129,992 | 4,019,885 |
kWh
|
$0.032 |
Electricity Demand | $153,440 | 17,966 |
kW-mo/yr
|
$8.54 |
Natural Gas | $193,829 | 27,368 |
MMBtu
|
$7.08 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $39,654 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,363 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $2,468 | $500 |
$(-218.0)
-
kWh
|
$2,686
-
kW-mo/yr
|
- | - | - | |
02 | 2.2511: Insulate bare equipment | $17,983 | $2,000 |
$6,597
204,000
kWh
|
$5,226
-
kW-mo/yr
|
$6,160
-
MMBtu
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,895 | $400 |
$2,127
65,783
kWh
|
$918
-
kW-mo/yr
|
- | $(-150.0) | - | |
04 | 2.2123: Insulate feedwater tank | $339 | $1,133 | - | - |
$339
-
MMBtu
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,779 | $84,121 |
$9,338
288,742
kWh
|
$7,051
-
kW-mo/yr
|
- | - | $(-1,610.0) | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,190 | $399 |
$470
14,529
kWh
|
$720
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $39,654 | $88,553 |
$18,314
573,054
kWh
|
$16,601
-
kW-mo/yr
|
$6,499
-
MMBtu
|
$(-150.0) | $(-1,610.0) | ||
TOTAL IMPLEMENTED | $5,363 | $900 |
$1,909
65,783
kWh
|
$3,604
-
kW-mo/yr
|
- | $(-150.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs