Assessment Year | 2011 |
---|---|
Principal Product | Brake friction disks |
NAICS | 336340: Motor Vehicle Brake System Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $50 M to 100M |
# of Employees | 137 |
Plant Area |
125,000
ft2
|
Annual Production | 3,200,000
pieces
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $421,882 | 8,465,987 |
kWh
|
$0.050 |
Electricity Demand | $211,204 | 25,134 |
kW-mo/yr
|
$8.40 |
Natural Gas | $41,614 | 4,312 |
MMBtu
|
$9.65 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $50,128 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $43,616 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4226: Use / purchase optimum sized compressor | $15,045 | $14,125 |
$15,045
301,930
kWh
|
- | - | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $15,763 | $500 |
$13,497
270,684
kWh
|
$3,106
-
kW-mo/yr
|
- | $(-600.0) | $(-240.0) | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,611 | $50 |
$3,472
69,681
kWh
|
$3,139
-
kW-mo/yr
|
- | - | - | |
04 | 2.2437: Recover waste heat from equipment | $3,704 | $3,200 |
$(-217.0)
(-4,351)
kWh
|
$(-62.0)
-
kW-mo/yr
|
$3,983
-
MMBtu
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $244 | $225 |
$171
3,438
kWh
|
$73
-
kW-mo/yr
|
- | - | - | |
06 | 2.7241: Install outside air damper / economizer on hvac unit | $6,197 | $10,500 |
$5,047
101,284
kWh
|
- | - | - | $1,150 | |
07 | 2.7245: Use direct air supply to exhaust hoods | $2,564 | $3,143 |
$468
9,387
kWh
|
$846
-
kW-mo/yr
|
$1,250
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $50,128 | $31,743 |
$37,483
752,053
kWh
|
$7,102
-
kW-mo/yr
|
$5,233
-
MMBtu
|
$(-600.0) | $910 | ||
TOTAL IMPLEMENTED | $43,616 | $25,175 |
$37,061
743,579
kWh
|
$6,245
-
kW-mo/yr
|
- | $(-600.0) | $910 | ||