ITAC Assessment: NC0435
ITAC logo
ITAC Assessment: NC0435
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Elecrical wiring devices
NAICS 335931: Current-Carrying Wiring Device Manufacturing
SIC 3643: Current-Carrying Wiring Devices
Sales Range $100
M
to 500
M
# of Employees 70
Plant Area 330,000
ft2
Annual Production 25,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $225,941 3,732,900
kWh
Electricity Demand $29,029 8,923
kW-mo/yr
Electricity Fees $7,880 -
Natural Gas $13,320 1,198
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $71,084 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,322

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.8114: Change rate schedules or other changes in utility service $23,638 - $19,836
-
kWh
- $3,802
02 2.7142: Utilize higher efficiency lamps and/or ballasts $44,479 $72,211 $39,150
646,786
kWh
$5,329
-
kW-mo/yr
-
03 2.7144: Install spectral reflectors / delamp $1,887 $7,760 $1,453
24,008
kWh
$434
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $661 $1,911 $661
10,915
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $124 $31 $96
1,580
kWh
$28
-
kW-mo/yr
-
06 2.7261: Install timers and/or thermostats $295 $1,500 $295
4,885
kWh
- -
TOTAL RECOMMENDED $71,084 $83,413 $61,491
688,174
kWh
$5,791
-
kW-mo/yr
$3,802
TOTAL IMPLEMENTED $47,322 $83,382 $41,559
686,594
kWh
$5,763
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs