Assessment Year | 2011 |
---|---|
Principal Product | Adhesive tapes |
NAICS | 322220: Paper Bag and Coated and Treated Paper Manufacturing |
SIC | 2672: Coated and Laminated Paper, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 300 |
Plant Area |
300,000
ft2
|
Annual Production | 3,000,000
thousand feet
|
Production Hrs. Annual | 6,600
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $562,711 | 16,415,070 |
kWh
|
$0.034 |
Electricity Demand | $227,955 | 47,598 |
kW-mo/yr
|
$4.79 |
Electricity Fees | $240 | - |
|
- |
Natural Gas | $1,395,224 | 166,044 |
MMBtu
|
$8.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $75,601 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $27,079 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2441: Preheat boiler makeup water with waste process heat | $28,591 | $51,300 | - | - |
$26,541
-
MMBtu
|
- | - |
$2,050
-
Tgal
|
|
02 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $9,751 | $25,000 | - | - |
$9,571
-
MMBtu
|
- | - |
$180
-
Tgal
|
|
03 | 2.2113: Repair or replace steam traps | $12,484 | $5,500 | - | - |
$16,584
-
MMBtu
|
$(-500.0) | $(-3,600.0) | - | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $10,180 | $25,000 | - | - |
$10,180
-
MMBtu
|
- | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,844 | $100 |
$4,828
130,166
kWh
|
$856
-
kW-mo/yr
|
- | $(-600.0) | $(-240.0) | - | |
06 | 2.4151: Develop a repair/replace policy | $9,751 | $20,768 |
$7,897
212,908
kWh
|
$1,854
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $75,601 | $127,668 |
$12,725
343,074
kWh
|
$2,710
-
kW-mo/yr
|
$62,876
-
MMBtu
|
$(-1,100.0) | $(-3,840.0) |
$2,230
-
Tgal
|
||
TOTAL IMPLEMENTED | $27,079 | $26,368 |
$12,725
343,074
kWh
|
$2,710
-
kW-mo/yr
|
$16,584
-
MMBtu
|
$(-1,100.0) | $(-3,840.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs