ITAC Assessment: OK0428
ITAC logo
ITAC Assessment: OK0428
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Gypsum Wall Board
NAICS
n/a
SIC 3275: Gypsum Products
Sales Range $50
M
to 100
M
# of Employees 80
Plant Area
n/a
Annual Production 440,000,000
thousand feet
Production Hrs. Annual 8,736
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $814,289 15,929,953
kWh
Natural Gas $3,983,073 1,162,809
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,080,425 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Gas Savings
01 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $1,053,065 $5,000,000 $1,053,065
63,678,196
kWh
-
02 2.4133: Use most efficient type of electric motors $13,421 $16,008 $13,421
335,580
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $10,778 - $10,778
269,343
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,456 - $2,456
64,771
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $705 $2,530 - $705
-
MMBtu
TOTAL RECOMMENDED $1,080,425 $5,018,538 $1,079,720
64,347,890
kWh
$705
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs