ITAC Assessment: NC0405
ITAC logo
ITAC Assessment: NC0405
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Paints and stains
NAICS 325510: Paint and Coating Manufacturing
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $50
M
to 100
M
# of Employees 59
Plant Area 70,000
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,990 617,200
kWh
Electricity Demand $9,629 1,754
kW-mo/yr
Natural Gas $52,788 4,290
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,644 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,127

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $227 $200 $634
12,085
kWh
$133
-
kW-mo/yr
- $(-300.0) $(-240.0)
02 2.4231: Reduce the pressure of compressed air to the minimum required $900 $100 $747
14,248
kWh
$153
-
kW-mo/yr
- - -
03 2.4151: Develop a repair/replace policy $1,096 $4,858 $834
15,902
kWh
$262
-
kW-mo/yr
- - -
04 3.5142: Treat and reuse equipment cleaning solutions $31,421 - $(-9,146.0)
(-174,400)
kWh
$(-2,872.0)
-
kW-mo/yr
$43,439
-
gal
- -
TOTAL RECOMMENDED $33,644 $5,158 $(-6,931.0)
(-132,165)
kWh
$(-2,324.0)
-
kW-mo/yr
$43,439
-
gal
$(-300.0) $(-240.0)
TOTAL IMPLEMENTED $1,127 $300 $1,381
26,333
kWh
$286
-
kW-mo/yr
- $(-300.0) $(-240.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs