Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product metal food containers
NAICS 332431: Metal Can Manufacturing
SIC 3411: Metal Cans
Sales Range $1
M
to 5
M
# of Employees 23
Plant Area 125,000
ft2
Annual Production 80,000,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $125,773 1,254,480
kWh
Natural Gas $36,266 11,921
MMBtu
TOTAL YEARLY COSTS $162,039
RECOMMENDED SAVINGS* $10,976 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,761

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,673 $17,248 $805
7,969
kWh
$2,868
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,733 $10,423 $726
7,190
kWh
$1,007
03 2.7135: Install occupancy sensors $903 $760 $903
8,936
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,489 - $2,489
24,641
kWh
-
05 2.4227: Use compressor air filters $413 $300 $413
4,090
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $1,215 $1,160 $1,215
12,030
kWh
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $536 $50 $536
5,306
kWh
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $14 - $14
134
kWh
-
TOTAL RECOMMENDED $10,976 $29,941 $7,101
70,296
kWh
$3,875
TOTAL IMPLEMENTED $9,761 $28,781 $5,886
58,266
kWh
$3,875
Yearly Savings* Imp'd Cost* Electricity Usage Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs