| Assessment Year | 2017 |
|---|---|
| Principal Product | metal food containers |
| NAICS | 332431: Metal Can Manufacturing |
| SIC | 3411: Metal Cans |
| Sales Range | $1 M to 5M |
| # of Employees | 23 |
| Plant Area |
125,000
ft2
|
| Annual Production | 80,000,000
pieces
|
| Production Hrs. Annual | 2,125
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $125,773 | 1,254,480 |
kWh
|
$0.10 |
| Natural Gas | $36,266 | 11,921 |
MMBtu
|
$3.04 |
| TOTAL YEARLY COSTS | $162,039 | |||
| RECOMMENDED SAVINGS* | $10,976 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,761 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,673 | $17,248 |
$805
7,969
kWh
|
$2,868 | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,733 | $10,423 |
$726
7,190
kWh
|
$1,007 | |
| 03 | 2.7135: Install occupancy sensors | $903 | $760 |
$903
8,936
kWh
|
- | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,489 | - |
$2,489
24,641
kWh
|
- | |
| 05 | 2.4227: Use compressor air filters | $413 | $300 |
$413
4,090
kWh
|
- | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $1,215 | $1,160 |
$1,215
12,030
kWh
|
- | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $536 | $50 |
$536
5,306
kWh
|
- | |
| 08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $14 | - |
$14
134
kWh
|
- | |
| TOTAL RECOMMENDED | $10,976 | $29,941 |
$7,101
70,296
kWh
|
$3,875 | ||
| TOTAL IMPLEMENTED | $9,761 | $28,781 |
$5,886
58,266
kWh
|
$3,875 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs