ITAC Assessment: NC0402
ITAC logo
ITAC Assessment: NC0402
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Food Flavorings
NAICS 311930: Flavoring Syrup and Concentrate Manufacturing
SIC 2087: Flavoring Extracts and Flavoring Syrups, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 33,000
ft2
Annual Production 6,800,000
lb
Production Hrs. Annual 4,800
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,498 1,200,560
kWh
Electricity Demand $18,363 2,650
kW-mo/yr
Electricity Fees $2,714 -
Natural Gas $45,097 3,614
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,596 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,556

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2437: Recover waste heat from equipment $9,787 - - - $10,287
-
MMBtu
$(-500.0) -
02 2.2222: Convert liquid heaters from underfiring to immersion or submersion heating $3,632 $14,000 - - $3,632
-
MMBtu
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $497 $100 $528
16,114
kWh
$329
-
kW-mo/yr
- $(-300.0) $(-60.0)
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,982 - $2,164
66,067
kWh
$1,347
-
kW-mo/yr
- $(-723.0) $194
05 2.4151: Develop a repair/replace policy $445 $1,454 $274
8,364
kWh
$171
-
kW-mo/yr
- - -
06 2.2514: Cover open tanks $3,253 - $183
5,433
kWh
$112
-
kW-mo/yr
$2,958
-
MMBtu
- -
TOTAL RECOMMENDED $20,596 $15,554 $3,149
95,978
kWh
$1,959
-
kW-mo/yr
$16,877
-
MMBtu
$(-1,523.0) $134
TOTAL IMPLEMENTED $7,556 $15,554 $2,966
90,545
kWh
$1,847
-
kW-mo/yr
$3,632
-
MMBtu
$(-1,023.0) $134
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs