*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Drawn wire
NAICS 331222: Steel Wire Drawing
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range $1
M
to 5
M
# of Employees 59
Plant Area 102,000
ft2
Annual Production 3,550,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $132,934 4,143,700
kWh
Electricity Demand $72,088 8,647
kW-mo/yr
Electricity Fees $7,055 -
Natural Gas $187,058 13,596
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,006 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4151: Develop a repair/replace policy $3,818 $5,618 $2,510
78,229
kWh
$1,308
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,614 $20,040 $2,820
87,912
kWh
$1,469
-
kW-mo/yr
- $(-962.0) $287
03 2.4231: Reduce the pressure of compressed air to the minimum required $931 - $612
19,080
kWh
$319
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $207 $100 $268
8,346
kWh
$139
-
kW-mo/yr
- $(-200.0) -
05 2.4239: Eliminate or reduce compressed air usage $1,610 $2,170 $1,069
32,400
kWh
$541
-
kW-mo/yr
- - -
06 2.1232: Keep boiler tubes clean $826 $1,000 - - $826
-
MMBtu
- -
TOTAL RECOMMENDED $11,006 $28,928 $7,279
225,967
kWh
$3,776
-
kW-mo/yr
$826
-
MMBtu
$(-1,162.0) $287
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs