ITAC Assessment: SD0432
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Noodles, Fortune cookies
NAICS 311824: Dry Pasta, Dough, and Flour Mixes Manufacturing from Purchased Flour
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 35,000
ft2
Annual Production 8,500,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,677 1,226,080
kWh
Electricity Demand $42,316 3,398
kW-mo/yr
Electricity Fees $1,800 -
Natural Gas $102,060 15,622
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,909 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,502

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,239 - $1,239
15,391
kWh
- -
02 2.1121: Use insulation in furnaces to facilitate heating / cooling $2,059 $800 - - $2,059
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $214 $100 $118
1,496
kWh
$96
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,412 $800 $1,107
13,574
kWh
$305
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $204 $427 $204
2,539
kWh
- -
06 2.2622: Replace existing chiller with high efficiency model $3,408 $8,000 $2,512
31,205
kWh
$896
-
kW-mo/yr
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,373 $8,285 $3,373
41,895
kWh
- -
TOTAL RECOMMENDED $11,909 $18,412 $8,553
106,100
kWh
$1,297
-
kW-mo/yr
$2,059
-
MMBtu
TOTAL IMPLEMENTED $3,502 $1,227 $1,443
17,930
kWh
- $2,059
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs