ITAC Assessment: NC0394
ITAC logo
ITAC Assessment: NC0394
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Liquid and solid CO2
NAICS 325120: Industrial Gas Manufacturing
SIC 2813: Industrial Gases
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 112,500
ft2
Annual Production 405,000,000
lb
Production Hrs. Annual 8,600
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,961,435 46,452,000
kWh
Electricity Demand $1,087,389 77,791
kW-mo/yr
Electricity Fees $38,628 -
Natural Gas $11,423 1,410
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,961 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.2511: Insulate bare equipment $22,190 $6,149 $15,177
359,480
kWh
$7,013
-
kW-mo/yr
- - - -
02 2.4151: Develop a repair/replace policy $5,639 $7,629 $3,859
91,408
kWh
$1,780
-
kW-mo/yr
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,706 $19,737 $5,239
124,085
kWh
$2,421
-
kW-mo/yr
- $(-1,358.0) $404 -
04 2.2437: Recover waste heat from equipment $4,909 $6,600 - - $4,909
-
MMBtu
- - -
05 3.4115: Recover and reuse cooling water $4,517 $3,850 $(-27.0)
(-642)
kWh
$(-13.0)
-
kW-mo/yr
- - - $4,557
-
Tgal
TOTAL RECOMMENDED $43,961 $43,965 $24,248
574,331
kWh
$11,201
-
kW-mo/yr
$4,909
-
MMBtu
$(-1,358.0) $404 $4,557
-
Tgal
TOTAL IMPLEMENTED - - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs