Assessment Year | 2009 |
---|---|
Principal Product | Adhesive labels |
NAICS | 322220: Paper Bag and Coated and Treated Paper Manufacturing |
SIC | 2672: Coated and Laminated Paper, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 115 |
Plant Area |
85,000
ft2
|
Annual Production | 200,000
thousand feet
|
Production Hrs. Annual | 5,600
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $122,574 | 3,861,840 |
kWh
|
$0.032 |
Electricity Demand | $80,673 | 9,438 |
kW-mo/yr
|
$8.55 |
Natural Gas | $212,862 | 17,486 |
MMBtu
|
$12.17 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $61,743 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,404 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1321: Replace fossil fuel equipment with electrical equipment | $46,662 | $67,500 |
$(-99,667.0)
(-3,140,111)
kWh
|
$(-53,452.0)
-
kW-mo/yr
|
$199,781
-
MMBtu
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $871 | $100 |
$1,114
35,092
kWh
|
$597
-
kW-mo/yr
|
- | $(-600.0) | $(-240.0) | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,075 | - |
$700
22,046
kWh
|
$375
-
kW-mo/yr
|
- | - | - | |
04 | 2.4226: Use / purchase optimum sized compressor | $1,533 | $50 |
$771
24,300
kWh
|
$762
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $379 | $432 |
$220
6,927
kWh
|
$159
-
kW-mo/yr
|
- | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,223 | $50,369 |
$8,767
276,214
kWh
|
$4,700
-
kW-mo/yr
|
- | $(-3,414.0) | $1,170 | |
TOTAL RECOMMENDED | $61,743 | $118,451 |
$(-88,095.0)
(-2,775,532)
kWh
|
$(-46,859.0)
-
kW-mo/yr
|
$199,781
-
MMBtu
|
$(-4,014.0) | $930 | ||
TOTAL IMPLEMENTED | $2,404 | $150 |
$1,885
59,392
kWh
|
$1,359
-
kW-mo/yr
|
- | $(-600.0) | $(-240.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs