ITAC Assessment: NC0390
ITAC logo
ITAC Assessment: NC0390
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Adhesive labels
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2672: Coated and Laminated Paper, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 115
Plant Area 85,000
ft2
Annual Production 200,000
thousand feet
Production Hrs. Annual 5,600
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $122,574 3,861,840
kWh
Electricity Demand $80,673 9,438
kW-mo/yr
Natural Gas $212,862 17,486
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,743 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,404

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.1321: Replace fossil fuel equipment with electrical equipment $46,662 $67,500 $(-99,667.0)
(-3,140,111)
kWh
$(-53,452.0)
-
kW-mo/yr
$199,781
-
MMBtu
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $871 $100 $1,114
35,092
kWh
$597
-
kW-mo/yr
- $(-600.0) $(-240.0)
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,075 - $700
22,046
kWh
$375
-
kW-mo/yr
- - -
04 2.4226: Use / purchase optimum sized compressor $1,533 $50 $771
24,300
kWh
$762
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $379 $432 $220
6,927
kWh
$159
-
kW-mo/yr
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $11,223 $50,369 $8,767
276,214
kWh
$4,700
-
kW-mo/yr
- $(-3,414.0) $1,170
TOTAL RECOMMENDED $61,743 $118,451 $(-88,095.0)
(-2,775,532)
kWh
$(-46,859.0)
-
kW-mo/yr
$199,781
-
MMBtu
$(-4,014.0) $930
TOTAL IMPLEMENTED $2,404 $150 $1,885
59,392
kWh
$1,359
-
kW-mo/yr
- $(-600.0) $(-240.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs