Assessment Year | 2009 |
---|---|
Principal Product | Toothpaste tubes |
NAICS | 332439: Other Metal Container Manufacturing |
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $500 k to 1M |
# of Employees | 203 |
Plant Area |
40,000
ft2
|
Annual Production | 700,000,000
pieces
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $266,875 | 7,743,000 |
kWh
|
$0.034 |
Electricity Demand | $178,111 | 14,020 |
kW-mo/yr
|
$12.70 |
Natural Gas | $24,580 | 1,701 |
MMBtu
|
$14.45 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $79,067 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2622: Replace existing chiller with high efficiency model | $31,742 | $49,000 |
$17,010
384,525
kWh
|
$14,732
-
kW-mo/yr
|
- | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,160 | - |
$4,491
101,530
kWh
|
$1,669
-
kW-mo/yr
|
- | - | - | |
03 | 2.2437: Recover waste heat from equipment | $9,621 | $3,300 | - | - |
$9,621
-
MMBtu
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,236 | $100 |
$3,673
83,030
kWh
|
$1,363
-
kW-mo/yr
|
- | $(-1,200.0) | $(-600.0) | |
05 | 2.4151: Develop a repair/replace policy | $2,916 | $2,848 |
$2,127
48,081
kWh
|
$789
-
kW-mo/yr
|
- | - | - | |
06 | 2.3132: Recharge batteries on during off-peak demand periods | $1,520 | - | - |
$1,520
-
kW-mo/yr
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,493 | $6,490 |
$2,549
57,614
kWh
|
$944
-
kW-mo/yr
|
- | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,405 | $32,776 |
$11,927
269,606
kWh
|
$4,429
-
kW-mo/yr
|
- | - | $(-2,951.0) | |
09 | 2.7135: Install occupancy sensors | $6,974 | $8,400 |
$6,974
157,651
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $79,067 | $102,914 |
$48,751
1,102,037
kWh
|
$25,446
-
kW-mo/yr
|
$9,621
-
MMBtu
|
$(-1,200.0) | $(-3,551.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs