Assessment Year | 2008 |
---|---|
Principal Product | Industrial work clothing |
NAICS | 315220: Men’s and Boys’ Cut and Sew Apparel Manufacturing |
SIC | 2326: Men's and Boys' Work Clothing |
Sales Range | $10 M to 50M |
# of Employees | 128 |
Plant Area |
36,900
ft2
|
Annual Production | 9,300,000
lb
|
Production Hrs. Annual | 4,800
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $90,897 | 1,301,477 |
kWh
|
$0.070 |
Electricity Demand | $19,372 | 3,595 |
kW-mo/yr
|
$5.39 |
Electricity Fees | $1,711 | - |
|
- |
LPG | $406,434 | 28,949 |
MMBtu
|
$14.04 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $128,553 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,668 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $80,420 | $183,000 |
$(-23,319.0)
(-334,080)
kWh
|
$(-4,501.0)
-
kW-mo/yr
|
- |
$123,240
-
MMBtu
|
- | $(-15,000.0) | - | |
02 | 2.1224: Replace boiler | $34,528 | $60,000 | - | - |
$34,528
-
MMBtu
|
- | - | - | - | |
03 | 2.1133: Adjust burners for efficient operation | $1,430 | $800 | - | - | - |
$1,430
-
MMBtu
|
- | - | - | |
04 | 2.2511: Insulate bare equipment | $1,224 | $1,030 | - | - | - |
$1,224
-
MMBtu
|
- | - | - | |
05 | 2.1135: Repair furnaces and oven doors so that they seal efficiently | $998 | $500 | - | - | - |
$998
-
MMBtu
|
- | - | - | |
06 | 2.2437: Recover waste heat from equipment | $6,183 | $4,900 | - | - | - |
$6,183
-
MMBtu
|
- | - | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,016 | $100 |
$1,626
23,296
kWh
|
$290
-
kW-mo/yr
|
- | - | $(-600.0) | - | $(-300.0) | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,562 | $1,472 |
$1,325
18,987
kWh
|
$237
-
kW-mo/yr
|
- | - | - | - | - | |
09 | 2.4151: Develop a repair/replace policy | $1,192 | $1,540 |
$999
14,317
kWh
|
$193
-
kW-mo/yr
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $128,553 | $253,342 |
$(-19,369.0)
(-277,480)
kWh
|
$(-3,781.0)
-
kW-mo/yr
|
$34,528
-
MMBtu
|
$133,075
-
MMBtu
|
$(-600.0) | $(-15,000.0) | $(-300.0) | ||
TOTAL IMPLEMENTED | $4,668 | $2,430 |
$1,626
23,296
kWh
|
$290
-
kW-mo/yr
|
- |
$3,652
-
MMBtu
|
$(-600.0) | - | $(-300.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs