| Assessment Year | 2008 |
|---|---|
| Principal Product | Parts for construction equipment |
| NAICS | 333120: Construction Machinery Manufacturing |
| SIC | 3531: Construction Machinery and Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 200 |
| Plant Area |
98,500
ft2
|
| Annual Production | 15,000,000
lb
|
| Production Hrs. Annual | 7,200
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $271,835 | 5,936,625 |
kWh
|
$0.046 |
| Electricity Demand | $106,145 | 12,662 |
kW-mo/yr
|
$8.38 |
| Electricity Fees | $129,509 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $294,176 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,147 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2425: Use flue gases to heat process or service water | $8,150 | $8,000 | - | - |
$8,150
-
MMBtu
|
- | - | - | |
| 02 | 2.2437: Recover waste heat from equipment | $9,853 | $4,500 | - | - |
$9,853
-
MMBtu
|
- | - | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $864 | $100 |
$1,352
29,520
kWh
|
$412
-
kW-mo/yr
|
- | $(-600.0) | - | $(-300.0) | |
| 04 | 4.321: Optimize production lot sizes and inventories | $168,000 | $120,000 | - | - | - | $88,000 | $80,000 | - | |
| 05 | 4.424: Improve space comfort conditioning | $89,762 | $37,500 | - |
$(-6,238.0)
-
kW-mo/yr
|
- | $96,000 | - | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $16,126 | $91,580 |
$17,619
384,768
kWh
|
$5,374
-
kW-mo/yr
|
- | - | - | $(-6,867.0) | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $138 | $980 |
$106
2,307
kWh
|
$32
-
kW-mo/yr
|
- | - | - | - | |
| 08 | 2.4151: Develop a repair/replace policy | $1,283 | $1,540 |
$983
21,476
kWh
|
$300
-
kW-mo/yr
|
- | - | - | - | |
| TOTAL RECOMMENDED | $294,176 | $264,200 |
$20,060
438,071
kWh
|
$(-120.0)
-
kW-mo/yr
|
$18,003
-
MMBtu
|
$183,400 | $80,000 | $(-7,167.0) | ||
| TOTAL IMPLEMENTED | $2,147 | $1,640 |
$2,335
50,996
kWh
|
$712
-
kW-mo/yr
|
- | $(-600.0) | - | $(-300.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs