ITAC Assessment: NC0380
ITAC logo
ITAC Assessment: NC0380
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Parts for construction equipment
NAICS 333120: Construction Machinery Manufacturing
SIC 3531: Construction Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 98,500
ft2
Annual Production 15,000,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $271,835 5,936,625
kWh
Electricity Demand $106,145 12,662
kW-mo/yr
Electricity Fees $129,509 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $294,176 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,147

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.2425: Use flue gases to heat process or service water $8,150 $8,000 - - $8,150
-
MMBtu
- - -
02 2.2437: Recover waste heat from equipment $9,853 $4,500 - - $9,853
-
MMBtu
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $864 $100 $1,352
29,520
kWh
$412
-
kW-mo/yr
- $(-600.0) - $(-300.0)
04 4.321: Optimize production lot sizes and inventories $168,000 $120,000 - - - $88,000 $80,000 -
05 4.424: Improve space comfort conditioning $89,762 $37,500 - $(-6,238.0)
-
kW-mo/yr
- $96,000 - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $16,126 $91,580 $17,619
384,768
kWh
$5,374
-
kW-mo/yr
- - - $(-6,867.0)
07 2.7142: Utilize higher efficiency lamps and/or ballasts $138 $980 $106
2,307
kWh
$32
-
kW-mo/yr
- - - -
08 2.4151: Develop a repair/replace policy $1,283 $1,540 $983
21,476
kWh
$300
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $294,176 $264,200 $20,060
438,071
kWh
$(-120.0)
-
kW-mo/yr
$18,003
-
MMBtu
$183,400 $80,000 $(-7,167.0)
TOTAL IMPLEMENTED $2,147 $1,640 $2,335
50,996
kWh
$712
-
kW-mo/yr
- $(-600.0) - $(-300.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs