ITAC Assessment: UU0008
ITAC logo
ITAC Assessment: UU0008
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Plastic coating of rebar
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area 35,500
ft2
Annual Production 1,000
ton
Production Hrs. Annual 4,590
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,215 2,822,800
kWh
Electricity Demand $48,497 6,324
kW-mo/yr
Electricity Fees $7,617 -
Natural Gas $16,099 2,807
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,488 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,252

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,523 $125 $2,401
79,448
kWh
$1,122
-
kW-mo/yr
-
02 2.4314: Use synthetic lubricant $423 $400 $305
10,105
kWh
$118
-
kW-mo/yr
-
03 2.2437: Recover waste heat from equipment $1,204 $460 - - $1,204
-
MMBtu
04 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $5,102 $2,600 $3,478
115,072
kWh
$1,624
-
kW-mo/yr
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,236 $1,844 $915
30,291
kWh
$321
-
kW-mo/yr
-
TOTAL RECOMMENDED $11,488 $5,429 $7,099
234,916
kWh
$3,185
-
kW-mo/yr
$1,204
-
MMBtu
TOTAL IMPLEMENTED $10,252 $3,585 $6,184
204,625
kWh
$2,864
-
kW-mo/yr
$1,204
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs