ITAC Assessment: MZ0161
ITAC logo
ITAC Assessment: MZ0161
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product vehicle wheels
NAICS 336330: Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 350
Plant Area 620,000
ft2
Annual Production 6,300,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,218,970 41,282,684
kWh
Electricity Demand $454,584 72,422
kW-mo/yr
Natural Gas $614,768 117,864
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $162,078 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,710

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4224: Upgrade controls on compressors $54,484 $150,000 $54,484
1,013,670
kWh
- -
02 2.2437: Recover waste heat from equipment $5,393 $11,000 - - $5,393
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $36,359 $45,000 $30,627
569,802
kWh
$5,732
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,710 $12,000 $4,810
89,482
kWh
$900
-
kW-mo/yr
-
05 2.7221: Lower temperature during the winter season and vice-versa $60,132 - $30,264
563,044
kWh
$4,819
-
kW-mo/yr
$25,049
-
MMBtu
TOTAL RECOMMENDED $162,078 $218,000 $120,185
2,235,998
kWh
$11,451
-
kW-mo/yr
$30,442
-
MMBtu
TOTAL IMPLEMENTED $5,710 $12,000 $4,810
89,482
kWh
$900
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs