ITAC Assessment: NC0379
ITAC logo
ITAC Assessment: NC0379
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Rolls for paper industry
NAICS 333243: Sawmill, Woodworking, and Paper Machinery Manufacturing
SIC 3554: Paper Industries Machinery
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 60,000
ft2
Annual Production 200
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $93,372 3,585,727
kWh
Electricity Demand $55,480 7,447
kW-mo/yr
Electricity Fees $11,381 -
Natural Gas $160,469 12,787
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,635 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,929

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.1133: Adjust burners for efficient operation $871 $800 - - $871
-
MMBtu
- -
02 2.2126: Lower operating pressure of condenser (steam) $333 $100 - - $333
-
MMBtu
- -
03 2.7314: Reduce ventilation air $7,706 $25,500 - - $7,706
-
MMBtu
- -
04 2.7313: Recycle air for heating, ventilation and air conditioning $2,284 $3,000 - - $2,284
-
MMBtu
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $237 $50 $151
5,782
kWh
$86
-
kW-mo/yr
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $269 $100 $835
32,078
kWh
$334
-
kW-mo/yr
- $(-600.0) $(-300.0)
07 2.7142: Utilize higher efficiency lamps and/or ballasts $101 $308 $64
2,472
kWh
$37
-
kW-mo/yr
- - -
08 2.4151: Develop a repair/replace policy $834 $1,728 $532
20,446
kWh
$302
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $12,635 $31,586 $1,582
60,778
kWh
$759
-
kW-mo/yr
$11,194
-
MMBtu
$(-600.0) $(-300.0)
TOTAL IMPLEMENTED $4,929 $6,086 $1,582
60,778
kWh
$759
-
kW-mo/yr
$3,488
-
MMBtu
$(-600.0) $(-300.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs