ITAC Assessment: NC0374
ITAC logo
ITAC Assessment: NC0374
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Replacement automotive windshields
NAICS 327215: Glass Product Manufacturing Made of Purchased Glass
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $100
M
to 500
M
# of Employees 450
Plant Area 350,000
ft2
Annual Production 1,400,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $615,982 16,266,400
kWh
Electricity Demand $577,432 30,012
kW-mo/yr
Electricity Fees $361 -
Natural Gas $140,228 12,332
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $107,880 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $96,227

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $32,923 $63,000 $20,590
543,593
kWh
$12,333
-
kW-mo/yr
- -
02 2.4226: Use / purchase optimum sized compressor $5,372 $18,000 $5,372
141,833
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,977 $100 $2,988
78,870
kWh
$1,989
-
kW-mo/yr
$(-1,200.0) $(-800.0)
04 2.5194: Redesign process $11,653 $22,000 $6,436
166,920
kWh
$5,217
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,040 $7,000 $576
15,219
kWh
$464
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $53,915 $100,000 $29,104
743,040
kWh
$24,811
-
kW-mo/yr
- -
TOTAL RECOMMENDED $107,880 $210,100 $65,066
1,689,475
kWh
$44,814
-
kW-mo/yr
$(-1,200.0) $(-800.0)
TOTAL IMPLEMENTED $96,227 $188,100 $58,630
1,522,555
kWh
$39,597
-
kW-mo/yr
$(-1,200.0) $(-800.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs