ITAC Assessment: NC0365
ITAC logo
ITAC Assessment: NC0365
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Shopping carts
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 300,000
ft2
Annual Production 260,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,824 2,047,200
kWh
Electricity Demand $75,980 7,015
kW-mo/yr
Electricity Fees $2,654 -
Natural Gas $230,435 18,518
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,162 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,329

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7314: Reduce ventilation air $11,968 $28,000 $(-634.0)
(-15,365)
kWh
$(-338.0)
-
kW-mo/yr
$13,500
-
MMBtu
- $(-560.0)
02 2.4226: Use / purchase optimum sized compressor $11,898 $7,000 $7,314
177,227
kWh
$4,584
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,542 $100 $1,930
46,771
kWh
$1,212
-
kW-mo/yr
- $(-300.0) $(-300.0)
04 2.7142: Utilize higher efficiency lamps and/or ballasts $24,833 $71,577 $17,356
420,552
kWh
$10,892
-
kW-mo/yr
- - $(-3,415.0)
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,788 $50 $2,941
91,280
kWh
$1,847
-
kW-mo/yr
- - -
06 2.3212: Optimize plant power factor $6,133 $12,000 - $6,133
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $62,162 $118,727 $28,907
720,465
kWh
$24,330
-
kW-mo/yr
$13,500
-
MMBtu
$(-300.0) $(-4,275.0)
TOTAL IMPLEMENTED $37,329 $47,150 $11,551
299,913
kWh
$13,438
-
kW-mo/yr
$13,500
-
MMBtu
$(-300.0) $(-860.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs