Assessment Year | 2011 |
---|---|
Principal Product | Table Syrup |
NAICS | 311999: All Other Miscellaneous Food Manufacturing |
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 95 |
Plant Area |
250,000
ft2
|
Annual Production | 7,000,000
units
|
Production Hrs. Annual | 5,250
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $184,015 | 3,699,000 |
kWh
|
$0.050 |
Electricity Demand | $46,656 | 8,971 |
kW-mo/yr
|
$5.20 |
Electricity Fees | $22,323 | - |
|
- |
Natural Gas | $206,723 | 27,963 |
MMBtu
|
$7.39 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $64,853 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2444: Use hot process fluids to preheat incoming process fluids | $23,085 | $6,000 |
$(-260.0)
(-5,222)
kWh
|
- |
$23,345
-
MMBtu
|
|
02 | 2.1221: Replace obsolete burners with more efficient ones | $15,024 | $14,500 | - | - |
$15,024
-
MMBtu
|
|
03 | 2.2414: Use waste heat from hot flue gases to preheat | $7,550 | $6,000 |
$(-155.0)
(-3,120)
kWh
|
- |
$7,705
-
MMBtu
|
|
04 | 2.7135: Install occupancy sensors | $6,237 | $4,440 |
$5,280
106,233
kWh
|
$957
-
kW-mo/yr
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $4,796 | $765 |
$3,993
80,334
kWh
|
$803
-
kW-mo/yr
|
- | |
06 | 2.1222: Install turbulators | $4,508 | $1,500 | - | - |
$4,508
-
MMBtu
|
|
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,439 | $650 |
$2,011
33,471
kWh
|
$428
-
kW-mo/yr
|
- | |
08 | 2.4133: Use most efficient type of electric motors | $1,214 | $5,820 |
$880
17,698
kWh
|
$334
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $64,853 | $39,675 |
$11,749
229,394
kWh
|
$2,522
-
kW-mo/yr
|
$50,582
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs